首页> 外文会议>International conference on probabilistic safety assessment and management;PSAM4 >Core Damage Frequency Estimation Using Accident Sequence Precursor Data: 1990-1993
【24h】

Core Damage Frequency Estimation Using Accident Sequence Precursor Data: 1990-1993

机译:使用事故序列前兆数据估算核心损坏频率:1990-1993年

获取原文

摘要

The Nuclear Regulatory Commission's (NRC's) ongoing Accident Sequence Precursor (ASP) program uses probabilistic risk assessment (PRA) techniques to assess the potential for severe core damage (henceforth referred to simply as core damage) based on operating events. The types of operating events considered include accident sequence intiators, safety equipment failures, and degradation of plant conditions that could increase the probabilitythat various postulated accident sequences occur. Such operating events potentially reduce the margin of safety available for prevention of core damage and thus can be considered as precursors to core damage. The current process for identifying, analyzing, and documenting ASP events is described in detail in Vanden Heuval et al[1]. The significance of a Licensee Event Report (LER) event (or events) is measured by means of the conditional probability that the event leads to core damage, the so-called conditional core damage probability or, simply, CCDP.
机译:核监管委员会(NRC)正在进行的事故序列前兆(ASP)计划使用概率风险评估(PRA)技术来根据运行事件评估严重的核心损坏(以下简称为核心损坏)的可能性。所考虑的操作事件的类型包括事故序列引发者,安全设备故障以及工厂状况的恶化,这可能会增加各种假定的事故序列发生的可能性。这种操作事件可能会降低可用于预防堆芯损坏的安全裕度,因此可以视为堆芯损坏的先兆。 Vanden Heuval等人[1]详细描述了当前识别,分析和记录ASP事件的过程。被许可人事件报告(LER)事件(一个或多个)的重要性是通过事件导致核心损坏的条件概率,所谓的有条件核心损坏概率或简称为CCDP来衡量的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号