首页> 外文会议>IEE/IMechE International Conference on Power Station Maintenance - Profitability Through Reliability >Development and implementation of an enhanced maintenance system for a 30 year old power station
【24h】

Development and implementation of an enhanced maintenance system for a 30 year old power station

机译:一个30岁的电站增强维修系统的开发与实施

获取原文

摘要

Prior to its sale to an international consortium led by National Power, Hazelwood Power Corporation was one of five generation companies which were established in February 1995 as a result of the Victorian government's decision to establish a competitive electricity market. The Company owned a 1600 MW (8 x 200 individual units) brown coal fired power station and an adjacent brown coal mine which has reserves sufficient for another 40 years of operation at Morwell in Victoria's Latrobe Valley. The Power Station's 8 units, which are the oldest units of the three Latrobe Valley generators, were progressively commissioned from November 1964 up until August 1971. The station's performance at that time was extremely poor due to low availability and excessively high maintenance costs. This paper concentrates on the strategy that we developed to lift the performance of the power station to a position where it could successfully compete with the other two Latrobe Valley brown coal generators whose more modern plant provided them with a significant competitive edge due to their inherent lower operation and maintenance cost structures. A considerable portion of this paper is devoted to the importance of developing an integrated operational maintenance culture which is driven by the fundamental business goals. The improvement process was driven by the use of a simple four element model which embraced both the technical and human factors associated with achieving optimal plant and business performance.
机译:在销售到由国家权力领导的国际联盟之前,Hazelwood Power Corporation是1995年2月成立的五代公司之一,导致维多利亚时代的政府决定建立竞争力的电力市场。公司拥有1600兆瓦(8 x 200个单位)棕色煤炭发电站和一个邻近的棕色煤矿,在维多利亚的拉脱叶谷莫尔韦尔的另外40多年的储备储备。电站的8个单位是三个拉特罗贝谷发电机的最古老的单位,从1964年11月逐步委托,直到1971年8月。由于低可用性和高维护成本,该站的表现非常差。本文专注于我们开发的策略,以便将电站的性能提升到它可以成功与其他两个拉脱谷棕色煤炭发生器成功竞争的位置,其更现代化的工厂由于其固有的较低而提供了显着的竞争优势。操作和维护成本结构。本文相当一部分,致力于开发综合运营维护文化的重要性,该文化由基本业务目标推动。通过使用一种简单的四个元素模型驱动改进过程,该模型包括与实现最佳植物和业务绩效相关的技术和人为因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号