Stator slot wedge testing of large pumped storage generator motors

机译:大型泵送存储发电机电机定子槽楔测试

获取原文

摘要

First Hydro Company, which is part of Edison Mission Energy, operates two large pumped storage power stations in North Wales. Dinorwig, which was commissioned between 1982 and 1984 is equipped with six 330 MVA GMs (generator motors) and is one of the largest pumped storage power stations in Europe. Ffestiniog, commissioned in the early 1960s, is equipped with four 95 MVA GMs. Pumped storage plant has to be flexible in operation and provide a fast response to changing load. This leads to high thermal and mechanical stresses within the GMs. High quality maintenance is therefore essential to ensure a high level of availability, but to reduce costs outage times must be kept to a minimum. Semi-automatic equipment has been developed by FHC and IDB to measure the tightness of the stator slot wedging at both Dinorwig and Ffestiniog Power Stations. Plant outage times and labour costs have been reduced and the equipment is providing consistent measurements which are being trended against time to plan major maintenance on the GMs.
机译:第一家水电公司是爱迪生任务能源的一部分,在北威尔士运营了两个大型泵送存储电站。 Dinorwig于1982年至1984年间委托,配备了六个330个MVA GMS(发电机电机),是欧洲最大的泵送存储电站之一。在20世纪60年代初委托的Ffestiniog,配备了四个95个MVA GMS。泵送储存设备在操作中必须灵活,并提供对变换负载的快速响应。这导致GMS内的高热和机械应力。因此,高质量的维护是必须确保高水平的可用性,但要降低成本中断时期必须保持最低限度。半自动设备已由FHC和IDB开发,以测量定子槽缠绕在Dinorwig和Ffestiniog发电站的定子槽的紧张性。植物中断时报和劳动力成本已经减少,设备提供一致的测量,这些测量正在接触时间来计划对GMS的重大维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号