This paper discusses the planning, design, and start-up of the 90 tph PCI facility for National Steel's Great Lakes Steel Division in River Rouge, MI. This project is owned and operated by Edison Energy Services, and was implemented on a fast-track basis by Raytheon Engineers & Constructors, Babcock Material Handling, and Babcock & Wilcox. This paper present improtant process issues, basic design criteria, and the challenges of engineering and building a state-of-the-art PCI facility in two existing plants. Pulverized coal is prepared at the River Rouge Power Plant of Detroit Edison, is pneumatically conveyed 6,000 feet to a storage silo at Great Lakes Steel, and is injected into three blast furnaces.
机译:本文讨论了MI河河河河瑞典钢铁湖钢铁部门90 TPH PCI设施的规划,设计和启动。该项目由爱迪生能源服务拥有和运营,并通过雷神工程师和建筑师,巴布柯克材料处理和Babcock&Wilcox进行快速实施。本文呈现了克制的过程问题,基本的设计标准以及工程的挑战,并在两个现有植物中建立了最先进的PCI工厂。在底特律爱迪生的河胭脂发电厂准备粉煤,气动地将6,000英尺的储存筒仓输送到大湖钢,并注入三个高炉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号