首页> 外文会议>International mineral processing congress >From beneficiation tests to industrial production: valuation of the Itakpe iron ore deposit for the benefit of the developing Nigerian industry
【24h】

From beneficiation tests to industrial production: valuation of the Itakpe iron ore deposit for the benefit of the developing Nigerian industry

机译:从受益测试到工业生产:估价ITAKPE铁矿石矿床为发展中国家的尼日利亚工业

获取原文

摘要

The TAKPE MINING PROJECT has beendeveloped for the purpose of supplying the Nigerian Steelindustry with a sinter-feed type concentrate and a pellet-feedtype uperconcentrate. From the beginning, the project has beendeveloped in conjunction between engineers of the NigerianProject Company and European specialists. The nominalcapacity is 2.2 million tpy of concentrate (63-65 percent Fecontent) produced by crushing, semi-autogenous milling, andconcentration mainly carried out stages of spirals. Thesuperconcentrate (68 percent Fe content) will be produced byregrinding of the concentrate and flotation to remove free silica.
机译:Takpe矿业项目是为了提供尼日利亚钢铁工业的目的,用烧结液浓缩物和颗粒式饲料型uperconcentrate提供。从一开始,该项目在尼日利亚项目公司和欧洲专家的工程师之间联合开学。通过破碎,半自动研磨和浓度产生的浓缩物(63-65%的FeContent)的名义加法率为220万吨,主要进行螺旋的阶段。将浓缩物(68%Fe含量)(68%的Fe含量)制备,以制备浓缩物和浮选以除去游离二氧化硅。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号