首页> 外文会议>ASME·JSME International Conference on Nuclear Engineering >AGING ASSESSMENT AND LICENSE RENEWALS: Plant Life Management For The First Stage Boiling Water Reactor
【24h】

AGING ASSESSMENT AND LICENSE RENEWALS: Plant Life Management For The First Stage Boiling Water Reactor

机译:老化评估和许可证续期:植物寿命管理第一阶段沸水反应堆

获取原文

摘要

The first stage Boiling Water Reactors (BWRs) have been operating more than 25 years. Some components have potential of failure by aging. So, evaluations have been done for the main components such as Reactor Pressure Vessel (RPV), Reactor Internals, Primary Coolant Piping, Reactor Recirculation Pump, Cable (Inside PCV), Primary Containment Vessel (PCV) and Concrete Structure. This evaluation has been done by joint study between electric utilities and manufactures to confirm integrity and identify necessary development.
机译:第一阶段沸水反应器(BWRS)已经超过25年。一些组件具有衰老的潜力。因此,已经为反应器压力容器(RPV),反应器内部,一次冷却剂管道,反应器再循环泵,电缆(内部PCV),主要容器容器(PCV)和混凝土结构进行评估。该评估已经通过联合研究电力公用事业和制造商来确认完整性并确定必要的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号