首页> 外文会议>ASME·JSME International Conference on Nuclear Engineering >NUCLEAR REGULATORY COMMISSION PROBABILISTIC RISK ASSESSMENT IMPLEMENTATION PROGRAM A STATUS REPORT
【24h】

NUCLEAR REGULATORY COMMISSION PROBABILISTIC RISK ASSESSMENT IMPLEMENTATION PROGRAM A STATUS REPORT

机译:核监管委员会概率风险评估实施方案现状报告

获取原文

摘要

The U.S. Nuclear Regulatory Commission (NRC) is undertaking a number of activities intended to increase the consideration of risk significance in its decision processes and the effective use of risk-based technologies in its regulatory activities. Although the NRC is moving toward risk-informed regulation throughout its areas of responsibilities, this paper focuses primarily on those issues associated with reactor regulation. As the NRC completed significant milestones in its development of probabilistic risk assessment (PRA) methodology and gained considerable experience in the limited application of risk assessment to selected regulatory activities, it became evident that a much broader use of risk- informed approaches offered advantages to both the NRC and the U.S. commercial nuclear industry. This desire to enhance the use of risk assessment is driven by the clear belief that application of PRA methods will result in direct improvements in nuclear power plant operational safety from the perspective of both the regulator and the plant operator. The NRC believed that an overall policy on the use of PRA methods in nuclear regulatory activities should be established so that the many potential applications of PRA could be implemented in a consistent and predictable manner that would promote regulatory stability and efficiency. Such a policy was established in the NRC policy statement on "Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities" (60 Federal Register (FR) 42622, August 16, 1995), and the NRC staff is executing the policy under an implementation plan. The broad implementation plan covers applications in the nuclear materials area as well as power reactor applications. The NRC staff is interacting with the nuclear industry on the following power reactor applications: 1) maintenance rule and on-line maintenance 2) graded quality assurance and other risk-ranking applications 3) risk-informed technical specifications Other important ongoing activities covered by the implementation plan include the following: 4) development of a general framework for risk-informed reactor regulation, including appropriate PRA standards 5) development of an integrated performance assessment process for nuclear power plants 6) reviews of individual plant examinations 7) application of risk assessment techniques to the evaluation of human performance in the use of medical radiation devices 8) application of risk assessment techniques in the evaluation of methods of storing nuclear waste This paper describes the key activities that the NRC has undertaken to implement the initial stages of an integrated risk-informed regulatory framework.
机译:美国核管理委员会(NRC)正在进行一系列的旨在提高其决策过程中考虑的风险意义的活动,并在其监管活动的有效利用基于风险的技术。虽然NRC向整个责任领域的风险知情调节运动,本文主要侧重于与反应器调节相关这些问题。由于NRC完成概率风险评估(PRA)方法的发展显著的里程碑,并在风险评估的应用有限选择的监管活动中获得了相当的经验,很明显,更广泛使用的风险 - 通知方法提供都有好处在NRC和美国商用核工业。这加强使用风险评估的愿望是明确的信念是,PRA方法的应用将导致从监管机构和工厂操作员两个角度对核电厂运行安全的直接改善驱动。核管理委员会认为,对使用的核监管活动PRA方法的总体政策应建立,使PRA的许多潜在的应用可以在一个一致的和可预测的方式,将促进监管的稳定性和效率来实现。这样的政策是建立在“使用核监管活动的概率风险评估方法”(60联邦纪事(FR)42622,1995年8月16日)NRC的政策声明,以及NRC工作人员在实施计划执行政策。在核材料领域的广泛实施计划涵盖的应用以及电力电抗器的应用。通过覆盖1)维护规则和在线维护2)分级质量保证等风险分级的应用3)风险知情技术规格其他重要的持续活动:NRC工作人员与核工业以下动力反应堆应用程序进行交互实施方案包括以下内容:4)风险知情反应堆监管的总体框架的发展,包括适当的PRA标准5)核电厂的综合绩效考核工作6)单株考试的反馈7)风险评估的应用开发技术人员绩效的评估,在使用医疗辐射的设备8)的风险评估技术应用在存储核废料本文介绍的主要活动是,NRC已着手实施综合风险的初始阶段的方法评估-informed监管框架。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号