【24h】

PERMIT EXEMPTION STRATEGIES FOR ONSITE WASTE PROCESSING FACILITIES

机译:允许现场废物处理设施的豁免策略

获取原文

摘要

Onsite hazardous waste processors often findobtaining a Treatment Storage and Disposal (TSD) permit oneof their first major challenges. Some processors may spend thetime and money required by the permitting process, only to findout later that a permit was not necessary.This paper will present and analyze four strategies thatprocessors may use to avoid obtaining a TSD permit. Somefacilities will be able to remove their waste streams fromRcRA's oversight by ensuring the material is not "hazardous"waste. Parties that treat waste while it is in process may beable to avoid generating "waste" altogether. certain treatmentfacilities have been specifically exempted by EPA. Finally,treatment of waste while it is in generator storage tanks may beallowed without a RCRA TSD permit.Hazardous waste point of generation, an importantdetermination relating to these strategies, will also be discussed.Generators and processors will find this paper useful whenevaluating their permit exemption potential.
机译:现场危险废物处理器经常捕获治疗储存和处置(TSD)允许他们的第一次重大挑战。一些处理器可能会花费允许的过程所需的时间和金钱,仅在后面找不到许可证。本文将出现并分析四个策略,即处理器可用于避免获得TSD许可证。一些可行的行动能够通过确保材料不是“危险”浪费来消除他们的废物流罗拉的监督。治疗废物的缔约方在过程中可以避免完全产生“废物”。某些待遇是由EPA专门豁免。最后,在发电机储罐中处理废物可以在没有RCRA TSD许可的情况下衡量。也将讨论与这些策略有关的重要作用,也将讨论与这些策略有关的重要分解。Generator和处理器将发现本文有用,当时他们的许可证豁免潜在的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号