The Resource Constrained Project Scheduling Problem (RCPSP) is a well-known complex scheduling problem. In real world situations, the parameters of projects are vulnerable to uncertainty, change or disruption, which necessitates that the initial baseline schedule must be revised. In this work, we have proposed two different mathematical models for both the Discrete Time-Based Reactive Approach (DTRA) and the Event-Based Reactive Approach (EBRA), in an attempt to reduce the number of variables required in representing RCPSPs. The EBRA and DTRA are, therefore, to simultaneously determine the recovery start time, the resource profile, and the duration of each activity in the recovery schedule, in order to minimize the makespan for a single disruption, as well as a series of disruptions, without having any advance activity interruption information. To test the proposed approach, a set of thirty-activity test instances from the Project Scheduling Library (PSPLIB) and one real-life scheduling problem are solved with randomly generated disruption events. Computational experiments were also conducted to analyse the effects of different factors that relate to the disruption recovery process. The experimental study reveals that the re-optimization process can reduce the revised makespan, as compared to simple right shifting of affected activities, and the level of improvement depends on the duration of the affected activities, their resource requirements, their relationships with forwarding activities, the disruption duration and the amount of disrupted resources.
机译:资源受限的项目调度问题(RCPSP)是一个众所周知的复杂调度问题。在现实世界的情况下,项目的参数容易受到不确定性,变革或中断的影响,这需要必须修改初始基线时间表。在这项工作中,我们提出了两种不同的数学模型,用于离散时间的反应方法(DTRA)和基于事件的无功方法(EBRA),以减少代表RCPSPS所需的变量数。因此,EBRA和DTRA是同时确定恢复计划中每个活动的恢复开始时间,资源简档和持续时间,以便最小化单一中断的MEPESPH,以及一系列中断,没有任何提前活动中断信息。为了测试所提出的方法,通过随机生成的中断事件解决了来自项目调度库(PSPLIB)和一个现实寿命调度问题的三十活动测试实例。还进行了计算实验,以分析与破坏恢复过程相关的不同因素的影响。实验研究表明,重新优化过程可以减少修订后的Mapspan,与影响活动的简单右移相比,改善程度取决于受影响活动的持续时间,他们的资源要求,他们与转发活动的关系,中断持续时间和中断资源的金额。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号