首页> 外文会议>IEEE/NPSS Symposium on Fusion Engineering >TFTR-MG uprate, analysis and performance
【24h】

TFTR-MG uprate, analysis and performance

机译:TFTR-MG Uprate,分析和性能

获取原文

摘要

The energy requirement for TFTR operation at 5.2 Tesla is 4.5 GJ, 950 MVA provided by two 13.8 kV flywheel generators. To achieve tokamak fields beyond 5.2 Tesla (up to 6.0 Tesla), the MG system must be uprated to 1300 MVA, 15.0 kV and store 4.8 GJ of energy. The uprate is attainable by exploiting existing excess capacity and accepting reduced life. Considerations for the MG uprate include the number, level, duration, repetition rate of uprated pulses, and the expected life reduction. The mechanical degradation of the equipment due to speed overcurrent and over voltage was analyzed, as well as the deterioration of insulation due to thermal and mechanical stresses. This paper describes the requirements, and analysis and includes data of MG performance above rating.
机译:5.2特斯拉TFTR操作的能源要求是4.5 GJ,950 MVA,由两个13.8 kV飞轮发电机提供。为了实现5.2特斯拉(最多6.0特斯拉)的Tokamak Fields,MG系统必须升级到1300 MVA,15.0 kV和7.8 GJ的能量。通过利用现有的过剩能力并接受降低的生活来实现苏利。 MG Uprate的考虑包括升高脉冲的数量,水平,持续时间,重复率和预期的寿命。分析了由于速度过电流和过电压而导致的设备的机械劣化,以及由于热和机械应力引起的绝缘劣化。本文介绍了要求和分析,包括高于评级的MG性能数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号