首页> 外文会议>International Conference on Radioactive Waste Management and Environmental Remediation >ECONOMICAL, LEGAL AND POLITICAL ISSUES RELATING TO THE PROGRAM FOR DECOMMISSIONING THE GERMAN WISMUT URANIUM MINES AND MILLS
【24h】

ECONOMICAL, LEGAL AND POLITICAL ISSUES RELATING TO THE PROGRAM FOR DECOMMISSIONING THE GERMAN WISMUT URANIUM MINES AND MILLS

机译:与德国无魔术铀矿和工厂退役方案有关的经济,法律和政治问题

获取原文

摘要

One of the world's largest uranium mining districts is located in the German states of Saxony and Thuringia. In 45 years of intense mining efforts, 220,000 metric tonnes of uranium were produced. This corresponds to approximately 13% of the world's post-war production. The legacy of this huge strategic mining operation is widespread damage to the environment and to humans. Financed by the federal budget and administered by the German Ministry of Economics (BMWi), the national WISMUT Corporation is now carrying out an internationally unique decommissioning and rehabilitation program. The aim is to reduce the threat to the environment to a minimum, to implement an ecologically difficult shutdown of underground and surface mining facilities, and to decontaminate former mining sites for suitable reuse. The results of nearly five years of rehabilitation work show that substantial progress has been achieved. Nevertheless, the project is subject to permanent crossfire in the political arena, mainly due to the wide public interest in issues focusing on the danger of radiation to the environment.
机译:世界上最大的铀矿区之一位于德国萨克森和图林根州的德国国家。在45年的激烈采矿努力中,生产了220,000公吨的铀。这对应于世界战后生产的大约13%。这种巨大的战略挖掘运作的遗产是对环境和人类的广泛损害。由联邦预算资助并由德国经济部(BMWI)管理,国家无铋公司现在正在进行一个国际独特的退役和康复计划。目的是将对环境的威胁降低到最低限度,实现地下和地表采矿设施的生态困难关闭,并净化前采矿地点以获得合适的重用。结果近五年的康复工作表明,实现了实质性进展。尽管如此,该项目受到政治舞台的永久性交火,主要是由于对重点辐射环境辐射危险的问题的广泛公众兴趣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号