首页> 外文会议>Industry Applications Society Annual Petroleum and Chemical Industry Conference >CT SATURATION CALCULATIONS - ARE THEY APPLICABLE IN THE MODERN WORLD? - PART II, PROPOSED RESPONSIBILITIES
【24h】

CT SATURATION CALCULATIONS - ARE THEY APPLICABLE IN THE MODERN WORLD? - PART II, PROPOSED RESPONSIBILITIES

机译:CT饱和度计算 - 它们适用于现代世界吗? - 第二部分,拟议责任

获取原文

摘要

Part I expressed concerns about using IEEE Standard C37.110-1996 (1+X/R) criteria for sizing current transformers (CT's) for feeder short-circuit conditions [1]. Part II introduces an overview of relay filter algorithms, and proposes responsibilities of the IEEE Power System Relay Committee (PSRC), operating company and engineering company electrical power engineers, CT manufacturers, switchgear manufacturers, and relay manufacturers to guarantee CT/relay system performance. International Electrotechnical Commission (IEC) responsibilities are also included.
机译:第一部分对使用IEEE标准C37.110-1996(1 + X / R)标准进行送料器短路条件的电流互感器(CT)的标准进行担忧[1]。第二部分介绍了继电器过滤算法的概述,并提出了IEEE电力系统中继委员会(PSRC),运营公司和工程公司电力工程师,CT制造商,开关设备制造商以及继电器制造商的责任,以保证CT /继电器系统性能。还包括国际电工委员会(IEC)职责。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号