Interpolation method for 2S-DIRK-based EMT simulations

机译:基于2S-Dirk的EMT模拟的插值方法

获取原文

摘要

Interpolation algorithm plays an important role in the fixed step integration method, it can accurately get the action time of the switch. 2S-DIRK method has L-stability and 2-order accuracy, but the linear interpolation method based on 2S-DIRK will reduce the calculation accuracy to 1-order, which cannot be used in large power grid simulation. In this paper, based on Runge Kutta formula, a special 2-order interpolation algorithm was proposed. This algorithm does not satisfy the value of the middle point but can ensure that the accuracy of the interpolation process is not less than 2-order. The L-stability and the 2 order of accuracy in 2S-DRIK method are guaranteed. Finally, a combined example of LCC-HVDC system and IEEE9 system is used to verify that the proposed method can maintain the 2-order of accuracy in the whole calculation process.
机译:插值算法在固定步骤集成方法中起重要作用,可以准确地获得交换机的动作时间。 2S-DIRK方法具有L稳定性和2级精度,但基于2S-DIRK的线性插值方法将降低1阶的计算精度,这不能用于大电网仿真。本文基于Runge Kutta公式,提出了一种特殊的单阶插值算法。该算法不满足中间点的值,但可以确保插值过程的准确性不小于2阶。保证了2S-DRIK方法中的L稳定性和2个精度。最后,使用LCC-HVDC系统和IEEE9系统的组合示例来验证所提出的方法可以在整个计算过程中维持2阶的精度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号