Modelling an Extension Decision of BOT Transportation Infrastructure: A Risk-Adjusted Approach

机译:建模机器人运输基础设施的延长决策:一种风险调整方法

获取原文

摘要

Thailand has a long history in welcoming the private sector to participate in the development of large-scale infrastructure projects through a program called public private partnership or PPP. Build-operate-transfer (BOT) and build-transfer-operate (BTO) are two of commonly used PPP contracts for transportation infrastructure, in which the private (or the concessionaire) is responsible for the risks relating to the design, finance, construction, and operation and maintenance (O&M) of the project. As some of PPP transportation infrastructure projects in Thailand are approaching its final year of a concession period, decision as to extend or to end the contract must be made by a contracting agency, that is: (1) to extend the concession contract to the existing concessionaire for a certain period of years or (2) to let the concession expire and to have a responsible public agency assume the operation. This paper is to propose a decision-making model based on a level of risk exposure as a computational tool for comparing between a renewal package offered by the concessionaire and expected benefits generated under the operation by the public agency. A case study project, a BOT elevated road located in Bangkok, will be used to illustrate the application of the proposed model. One of the implications of this study is that the estimated figure computed using the proposed method may be treated as a public sector comparator (PSC), which can be used as an initial benchmark for the negotiation with the existing or a new concessionaire.
机译:泰国历史悠久,欢迎私营部门参与发展大型基础设施项目,通过涉及公共私人伙伴关系或PPP的计划。构建操作 - 转移(BOT)和建设转移操作(BTO)是用于运输基础设施的常用PPP合同中的两个,其中私人(或特许经营商)负责与设计,金融,建筑有关的风险和项目的操作和维护(O&M)。随着泰国的一些PPP运输基础设施项目正在接近其特许期的最后一年,缔约国必须延长或结束合同的决定,即:(1)将特许权合同扩展到现有特许公寓一段时间或(2)让特许权到期并拥有负责任的公共机构承担该行动。本文是提出基于风险敞口水平的决策模型作为计算工具,用于比较由公共机构运营所产生的特许经营商和预期效益所提供的更新包。一个案例研究项目,一个位于曼谷的机器人高架道,将用于说明所提出的模型的应用。本研究的一个含义是使用所提出的方法计算的估计数字可以被视为公共扇区比较器(PSC),其可以用作与现有或新的特许经营商协商的初始基准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号