The Bonnybrook Wastewater Treatment Plant (BBWWTP) is one of the largest cold weather BNR plants in the world undergoing a significant expansion, including a new outfall to discharge all treated effluent into the Bow River. The BBWWTP currently discharges all the treated effluent flow into the Bow River via a conventional bank outfall. The new outfall is not only required for plant expansion but also is an integral part of a flood protection plan for the site. Design of the outfall system was focused to strike a balance between flood protection capabilities, upsize for expected flow increase to year 2076, environmental enhancement, and cost. The outfall is designed to convey 1,962 MLD (22.71 m~3/s) (518 MGD) to a new exfiltration style diffuser under the bed of the Bow River. Construction of the new outfall is ongoing and scheduled to be complete by the end of 2021. The presentation will discuss the project drivers and motivations, some of the key design and construction challenges, and contracting strategy used to deliver this infrastructure.
机译:Bonnybrook污水处理厂(BBWWTP)是世界上最大的寒冷天气BNR工厂之一,正在进行大规模扩建,包括一个新的排水口,将所有处理过的污水排放到Bow河。BBWWTP目前通过传统的河岸排水口将所有处理后的污水流排入鲍河。新的排水口不仅是工厂扩建所需,也是现场防洪计划的组成部分。排水系统的设计重点是在防洪能力、预期流量增加到2076年的规模、环境改善和成本之间取得平衡。排水口设计用于将1962 MLD(22.71 m~3/s)(518 MGD)输送至鲍河河床下的新型渗出式扩散器。新的排污口的建设正在进行中,并计划在2021年底完成。本演示将讨论项目驱动因素和动机、一些关键的设计和施工挑战,以及用于交付该基础设施的承包策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号