首页> 外文会议>Pipelines Conference >Large Diameter Cured-in-Place Pipe Rehabilitation of Twin 90-Inch Culverts in Environmentally Sensitive Area
【24h】

Large Diameter Cured-in-Place Pipe Rehabilitation of Twin 90-Inch Culverts in Environmentally Sensitive Area

机译:在环境敏感区域的大直径固化管恢复曲线90英寸涵洞

获取原文

摘要

Insituform recently upgraded a pair of twin 90-in. equivalent diameter storm culverts near Beckley, West Virginia. The pipelines were located in a sensitive area. A waterfall was located upstream from the pipeline. Water to one pipeline had to be diverted while the other line was rehabbed. A trout stream was located downstream, which required that the contractor build a dam to keep water out of the stream. Each pipeline was approximately 200 ft long and ran directly underneath Interstate 77. The line was rehabbed using cured-in-place pipe (CIPP) to provide a fully structural, 50-year engineered design life. The CIPP was impregnated with resin and installed using an over-the-hole (OTH) method. This paper and presentation will cover project planning and engineering and an overview of the specialized impregnation and installation processes.
机译:Insituform最近升级了一对双胞胎90-In。相当于贝克利,西弗吉尼亚州附近的直径风暴涵洞。管道位于敏感区域。瀑布位于管道上游。在另一条线被重新恢复时,不得不转移到一个管道。鳟鱼流位于下游,要求承包商构建大坝以防止水流。每个管道大约是200英尺长,直接在州际公路下方跑了77。使用固化的管道(CIPP)恢复生产线,以提供完全结构,50年的工程设计寿命。 CIPP用树脂浸渍并使用过孔(OTH)方法安装。本文及演示将介绍项目规划和工程,以及专业浸渍和安装过程的概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号