首页> 外文会议>COTA International Conference of Transportation Professionals >Innovation in Construction Technologies of Bridge Towers
【24h】

Innovation in Construction Technologies of Bridge Towers

机译:桥楼施工技术的创新

获取原文
获取外文期刊封面目录资料

摘要

The towers of the Yangmeizhou Bridge is a single-pillar shape and its height is 181m, which is the highest building in Xiangtan City. This research focuses on several significant problems during construction, including how to prevent bored pile hole collapse when excavating large karst caves, how to improve piling efficiency of composite piles when excavating cobbles, how to assemble a large-diameter and double-wall steel cofferdam in deep water, how to control the temperature of mass concrete in summer, how to apply climbing formwork according to variable sections of towers, and how to install cable ducts and steel anchor beams with high precision. These findings provide a key guide and reference for similar bridge engineering projects.
机译:扬州桥的塔是一个单柱的形状,其高度为181米,这是湘潭市最高的建筑。这项研究侧重于施工过程中的几个重大问题,包括如何防止挖掘大型岩溶洞穴时的钻孔桩孔塌陷,如何提高挖掘鹅卵石时复合桩的打桩效率,如何组装大直径和双壁钢围堰深水,如何控制夏季质量混凝土的温度,如何根据塔的可变部分施加攀岩模板,以及如何安装高精度的电缆管道和钢锚梁。这些调查结果为类似的桥梁工程项目提供了一个关键指导和参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号