首页> 外文会议>APCA International Conference on Automatic Control and Soft Computing >Optimization of the Clinker Production Phase in a Cement Plant
【24h】

Optimization of the Clinker Production Phase in a Cement Plant

机译:水泥厂中的熟料生产阶段优化

获取原文

摘要

In this paper, the control and the optimization of the clinker production phase of an Italian dry cement industry is described. A tailored Advanced Process Control architecture has been proposed, based on a two-layer Model Predictive Control strategy. The critical process variables have been included in the controller setup through linear models with delays. The controller moves are computed through two subsequent constrained optimization problems with cooperation and consistency assumptions. The developed controller replaced a previous control system based on operators' conduction. Thanks to the predictive approach, more profitable operating points have been guaranteed, significantly improving the process control performances. Energy consumption and environmental emissions have been reduced, taking into account quality and production requirements.
机译:本文描述了意大利干水泥工业熟料生产阶段的控制和优化。基于双层模型预测控制策略,提出了一定量身定制的高级过程控制架构。通过具有延迟的线性模型,控制器设置中包含关键过程变量。控制器移动通过两个后续约束优化问题计算,具有合作和一致性假设。开发控制器根据操作员的传导替换了先前的控制系统。由于预测方法,已经保证了更有利可图的操作点,显着提高了过程控制性能。考虑到质量和生产要求,减少了能源消耗和环境排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号