Half-Wave Length Line Energization Case Test ?? Proposition of a Real Test

机译:半波长度线通电案例测试真实测试的主张

获取原文

摘要

In Brazil big blocks of energy will be transported through distances between 2500 and 3000 km to the strong network nodes. Among the AC transmission systems alternatives being analyzed the half-wave length transmission seems to be the natural solution as the lengths involved are around a half-wave length of a 60 Hz frequency system, as the Brazilian one. As there is no half-wave transmission system in operation in the world, there is a major sense of caution in order to be the first to construct and use this new AC-link. In order to give some support a field test with a set of existing similar 500 kV lines that could be connected in series was proposed to simulate the AC-link behavior under some controlled switching. The proposed AC-link test was simulated in PSCAD/EMTDC.
机译:在巴西,大块能源将通过2500至3000公里之间的距离传输到强大的网络节点。在正在研究的交流传输系统替代方案中,半波长传输似乎是自然的解决方案,因为所涉及的长度约为60 Hz频率系统的半波长度,就像巴西的那样。由于世界上没有运行中的半波传输系统,因此要成为第一个构建和使用这种新的交流链路的人,要特别注意。为了提供一些支持,建议使用一组可以串联连接的现有类似500 kV线路进行现场测试,以模拟在某些受控开关下的交流链路行为。拟议的交流链路测试在PSCAD / EMTDC中进行了仿真。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号