首页> 外文会议>IEEE International Conference on Smart Grid Communications >Risk limiting dispatch with ramping constraints
【24h】

Risk limiting dispatch with ramping constraints

机译:带有限制约束的风险限制调度

获取原文

摘要

The increasing penetration of renewable resources poses a challenge to the reliable operation of power systems. In particular, operators face the risk of not scheduling enough traditional generators when renewable generation becomes lower than expected. This paper studies the optimal trade-off between the system risk and the cost of scheduling reserve generators. The problem is modeled as a multi-period stochastic control problem, and in particular the ramping constraints on the generators are explicitly considered. The structure of the optimal dispatch control is identified. Based on the derived structure results, two types of control policies are proposed to efficiently compute the optimal dispatch: (i) a chance constrained policy, and (ii) efficient look-ahead policies. Utilizing real system data, the chance constrained dispatch is shown to outperform the look-ahead policies and to be robust to changes in the probability distribution of the uncertainties involved in the problem.
机译:可再生资源的日益普及对电力系统的可靠运行提出了挑战。特别是,当可再生能源发电量低于预期时,运营商将面临无法安排足够多的传统发电机的风险。本文研究了系统风险与调度备用发电机的成本之间的最佳权衡。该问题被建模为多周期随机控制问题,尤其是明确考虑了发电机的斜坡约束。确定了最佳调度控制的结构。基于得出的结构结果,提出了两种类型的控制策略来有效地计算最优调度:(i)机会约束策略,和(ii)有效的超前策略。利用实际系统数据,机会受限调度的性能优于先行策略,并且对于问题中不确定性的概率分布的变化具有较强的鲁棒性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号