首页> 外文会议>Software Metrics, 2005. 11th IEEE International Symposium >A replicated comparison of cross-company and within-company effort estimation models using the ISBSG database
【24h】

A replicated comparison of cross-company and within-company effort estimation models using the ISBSG database

机译:使用ISBSG数据库的跨公司和公司内部工作量估算模型的复制比较

获取原文

摘要

Four years ago was the last time the ISBSG database was used to compare the effort prediction accuracy between cross-company and within-company cost models. Since then more than 2,000 projects have been volunteered to this database, which may have changed the trends previously observed. This paper therefore replicates a previous study by investigating how successful a cross-company cost model is: i) to estimate effort for projects that belong to a single company and were not used to build the cross-company model; ii) compared to a within-company cost model. Our within-company data set had data on 184 software projects from a single company and our cross-company data set employed data on 672 software projects. Our results did not corroborate those from the previous study, showing that predictions based on the within-company model were not significantly more accurate than those based on the cross-company model. We analysed the data using forward stepwise regression.
机译:四年前,这是最后一次使用ISBSG数据库比较跨公司成本模型和公司内部成本模型之间的工作量预测准确性。从那时起,已有2,000多个项目自愿加入该数据库,这可能改变了以前观察到的趋势。因此,本文通过研究跨公司成本模型的成功程度来复制以前的研究:i)估算属于单个公司但未用于建立跨公司模型的项目的工作量; ii)与公司内部成本模型进行比较。我们的公司内部数据集包含来自单个公司的184个软件项目的数据,而我们的跨公司数据集使用了672个软件项目的数据。我们的结果没有证实先前的研究,表明基于公司内部模型的预测并不比基于跨公司模型的预测准确得多。我们使用正向逐步回归分析了数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号