首页> 外文会议>International Conference on Computer Science and Electronics Engineering >Research on Reactive Power Compensation Strategy Based on Time Series Method in Wind Farms
【24h】

Research on Reactive Power Compensation Strategy Based on Time Series Method in Wind Farms

机译:基于时间序列方法在风电场中的无功补偿策略研究

获取原文

摘要

This paper presents a strategy to make reactive compensation scheme in wind farms, combing wind power prediction with voltage and reactive power integrated control. Firstly, the wind power can be predicted by using ARIMA model. Secondly, the latter two can be calculated since there is a relationship among active power, reactive power and voltage. Therefore, the reactive compensation scheme can be made according to the voltage variation tendency. Being verified with simulation, the scheme can not only solve the problem of capacitor banks being frequently switched, but also make up for the lacks of capacitors by using SVG to ensure the stability of the bus voltage.
机译:本文提出了一种在风电场中进行反应补偿方案的策略,梳理风电预测电压和无功综合控制。首先,可以通过使用Arima模型来预测风电。其次,可以计算后两者,因为有源功率,无功功率和电压之间存在关系。因此,可以根据电压变化趋势进行反应补偿方案。通过模拟验证,该方案不仅可以解决电容器组经常切换的问题,而且通过使用SVG来弥补缺少电容器,以确保总线电压的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号