首页> 外文会议>Fusion Engineering, 2002. 19th Symposium on >Disruption load calculations using ANSYS transient electromagnetic simulations for the Alcator C-Mod antennas
【24h】

Disruption load calculations using ANSYS transient electromagnetic simulations for the Alcator C-Mod antennas

机译:使用ANSYS瞬态电磁仿真计算Alcator C-Mod天线的破坏负荷

获取原文

摘要

ANSYS has been used to compute eddy current loads in C-Mod antenna components due to a disruption. The antennas are on the outboard mid-plane, away from the direct involvement with halo currents, which characterize loading in the inner divertor and wall. Only inductively driven currents are computed. A rather complex but manageable electromagnetic model is used. Three of the antennas used in C-Mod were analyzed, Lower Hybrid, ICRH, and MHD antennas. The goal of these simulations was principally to quantify upper bound disruption loads.
机译:由于中断,ANSYS已用于计算C-Mod天线组件中的涡流负载。天线位于外侧中间平面上,远离直接参与晕电流的作用,晕电流表征内部分流器和壁中的负载。仅计算感应驱动电流。使用了一个相当复杂但易于管理的电磁模型。分析了C-Mod中使用的三种天线,即下混合天线,ICRH和MHD天线。这些模拟的目的主要是量化上限中断负荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号