首页> 外文会议>American Nuclear Society;Conference on Nuclear Plant Instrumentation, Control and Human-Machine Interface Technologies >EXPLORATION AND DEVELOPMENT OF MULTI-STAGE VALIDATION AS AN APPROACH TO ENHANCING CONFIDENCE IN THE HUMAN FACTORS VALIDATION OF NUCLEAR POWER PLANT CONTROL DESIGNS AND MODIFICATIONS
【24h】

EXPLORATION AND DEVELOPMENT OF MULTI-STAGE VALIDATION AS AN APPROACH TO ENHANCING CONFIDENCE IN THE HUMAN FACTORS VALIDATION OF NUCLEAR POWER PLANT CONTROL DESIGNS AND MODIFICATIONS

机译:多阶段验证的探索和发展,以增强对核电厂控制设计和修改的人为因素验证的信心

获取原文

摘要

The human factors engineering (HFE) validation of a nuclear power plant control roomdesign, or of a design modification (e.g., for modernization), is a complex undertaking that facesmany technical and logistical challenges. These challenges include conducting validations thataddress the diversity of operating conditions, staffing configurations, and failure scenarios that theplant will experience, or must be designed to tolerate. Such challenges must be addressed withinthe practical constraints of available resources (e.g., test personnel, participants, testbeds, andtime). How these challenges are addressed can impact the confidence that vendors, nuclear plantoperating companies, and regulatory authorities have in validation results and conclusions. Since2013, the Nuclear Energy Agency’s Working Group on Human and Organizational Factors hasbeen working with industry experts in control room validation to identify and advance thedevelopment of methods for enhancing confidence in control room validations. The most recentproduct of these efforts is a working group report that describes a general approach and rationalefor validating systems through a series of successive, coordinated validation activities. Theworking group refers to this approach as, multi-stage validation (MSV). This paper summarizesthe central concepts and issues discussed in the working group report, including the definingcharacteristics of MSV and those that characterize an effective MSV implementation. Alsoaddressed in this paper are methods and issues important to MSV implementation and its furtherdevelopment as an approach to the HFE validation of nuclear power plant control room designsand modifications.
机译:核电厂控制室的人为因素工程(HFE)验证 设计或进行设计修改(例如,现代化)是一项复杂的工作,它面临 许多技术和后勤挑战。这些挑战包括进行验证, 解决操作条件,人员配置和失败情况的多样性, 植物会经历,或者必须被设计成可以忍受的。这些挑战必须在 可用资源的实际限制条件(例如,测试人员,参与者,测试平台和 时间)。如何应对这些挑战会影响供应商,核电站的信心 运营公司和监管机构具有验证结果和结论。自从 2013年,核能局人与组织因素工作组 一直与控制室验证方面的行业专家合作,以识别并推进 开发用于增强对控制室验证的信心的方法。最近的 这些努力的结果是一个工作组报告,其中描述了一般方法和基本原理 通过一系列连续,协调的验证活动来验证系统。这 工作组将此方法称为多阶段验证(MSV)。本文总结 工作组报告中讨论的中心概念和问题,包括定义 MSV的特征以及有效实施MSV的特征。还 本文讨论的是对MSV实施及其进一步发展至关重要的方法和问题 开发作为核电厂控制室设计的HFE验证的一种方法 和修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号