Shore Approach Horizontal Directional Drill Crossings into the Bay of Fundy, New Brunswick

机译:岸边进入水平定向钻口进入欧洲湾,新不伦瑞克

获取原文

摘要

New Brunswick Power Transmission Corporation (NB Power) is constructing the Fundy Isles Transmission PowerLine Project which consists of 69 kV Submarine Cables from Deer Island, NB to Campobello Island, NB and fromCampobello Island to Grand Manan Island, NB. This project will provide electricity to the islands and will replaceexisting cables installed in 1978 and nearing the end of their service life.NB Power requested that the connection between the submarine and the land-based sections of the project becompleted utilizing the Horizontal Directional Drill (HDD) methodology to mitigate any concerns of futureexposure due to erosion from the large tidal action within the bay. The HDD crossings were to include theinstallation of three (3) HDPE conduits, one (1) 16-inch O.D. HDPE conduit along with two (2) spare 3.5-inchHDPE conduits for future corrosion protection measures inside a 24” common borehole. The project included four(4) shore approach crossings, designed to be progressed through 0-50% RQD Mafic Tuft, Shale bedrock, andoverburden materials.Marathon Underground Constructors Corporation (Marathon) was successful in the tendering process for theproject. CCI Inc. (CCI) was subcontracted to assist with production of feasible designs and provide HDDconstruction experience and support.The unique nature of the shore approach methodologies, space constraints, marine activities, and difficult groundconditions at the crossing locations culminated in complicated conditions for HDD installations.Through comprehensive engineering design, significant combined HDD experience, and Marathon’s ability to adaptto onsite conditions, two of the four crossings were successfully completed by HDD methods and two werecompleted with open cut methodologies with all completion dates meeting the required in-service date.This paper will discuss the challenges faced during both the design and construction phases of the shore approachcrossings.
机译:新的布伦瑞克电力传输公司(NB Power)正在构建Quisty Isles传输功率线路项目由鹿岛,NB到Campobello岛,NB和来自的69 kV潜艇电缆组成Campobello岛到Grand Manan Island,NB。该项目将向岛屿提供电力,并将取代现有电缆安装在1978年,并结束了他们的使用寿命。NB Power要求潜艇和项目的基于陆基之间的连接利用水平方向钻头(HDD)方法完成以减轻未来的任何疑虑由于海湾内的大型潮汐作用而导致的曝光。硬盘过境点包括包括安装三(3)个HDPE导管,一(1)16英寸O.D. HDPE管道以及两(2)备3.5英寸HDPE导管,用于将来24“常见钻孔内的未来腐蚀保护措施。该项目包括四个(4)岸边接近过境点,旨在通过0-50%RQD MAFIC Tuft,Shale Bucrock和覆盖物材料。Marathon地下构造函数公司(马拉松)在招标过程中取得了成功项目。 CCI Inc.(CCI)已转包协助生产可行的设计并提供硬盘施工经验和支持。岸边方法,空间限制,海洋活动和艰难地的独特性交叉位置的条件在复杂的HDD安装条件下终止。通过全面的工程设计,显着的HDD体验,以及马拉松的适应能力在现场条件下,通过HDD方法成功完成了四次交叉口中的两个,两条交叉路口使用开放方法完成,所有完成日期都满足所需的服务日期。本文将讨论岸边方法的设计和施工阶段所面临的挑战过境点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号