Combining Traditional Tunneling with Curved Microtunneling During Construction of the Doan Valley Relief and Consolidation Sewer

机译:将传统隧道与弯曲Microtunneling结合在垫子谷和固结下水道的施工过程中

获取原文

摘要

The Doan Valley Relief and Consolidation Sewer (DVRCS) is a combined sewer overflow control project in Cleveland, Ohio, with a $12.92M final construction value. The project required the installation of over 3,161 linear feet (LF) of 72-inch inside diameter (I.D.) trenchless sewer. Triad Engineering and Contracting, the Prime Contractor, installed most of the tunneled pipe using traditional open-face TBM methods. Triad’s subcontractor, Super Excavators, Inc. installed about 1,200 LF of the tunneled pipe using curved microtunneling methods. Triad’s contracting team was able to choose highly efficient construction methods due in part to flexibility provided in the bid documents. However, schedule constraints, difficult ground conditions (including boulders) and concerns of the City of Cleveland had to be overcome by the construction and design teams to complete the project. This paper highlights the successful completion of the project, including several challenges which the Contracting team overcame to complete the trenchless portions of the project.
机译:Doan Valley浮雕和整合下水道(DVRC)是俄亥俄州克利夫兰的综合下水道溢流控制项目,最终施工价值为12.92米。该项目需要安装超过3,161线性脚(LF),内径为72英寸(即)磁线下水道。 Triad Engineering and Contracting,Prime承包商,使用传统的开孔TBM方法安装了大部分隧道管道。三合一的分包商,超级挖掘机,Inc。使用弯曲的微管型方法安装了大约1,200毫升的隧道管道。三合会的缔约团队能够在投标文件中提供的灵活性,选择高效的施工方法。然而,建设和设计团队必须克服克利夫兰市的艰难地条件(包括巨石)和克利夫兰市的担忧来完成该项目。本文突出了该项目的成功完成,包括缔约团队汇票完成项目的挖掘部分的若干挑战。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号