Emergency Repair to Prevent a Major Sinkhole Utilizing Trenchless Methods

机译:紧急修复以防止主要污水孔利用挖沟方法

获取原文

摘要

The Wellesley Street Emergency Repair was completed on a 900 mm (36inch) x 600 mm (24inch) brick sewer under a very busy street in the heart of downtown Toronto, ON. The sewer was programed for CIPP rehabilitation by Toronto Water, but pre-lining videos revealed both extensive debris and serious instabilities in the brick sewer (the obvert of the pipe exhibited deformation with reverse curvature). As the debris was carefully removed, a large hole in the pipe was discovered and an even larger void outside the pipe revealed itself. An active service connection opposite the void increased the risk of the void size increasing rapidly. The void was determined to be approximately 4 m long and 6 m3 (8 yds3) in volume. To further increase the severity of the risk of the void propagating to the surface, a 12-inch cast iron watermain was within 1 m of the top of the void.The logistics to repair the pipe by excavation would be disruptive, complex, and inherently of high risk due to the presence of the watermain. The ultimate solution was a very innovative trenchless fix which included installing a CIPP liner to stabilize the pipe and then using an ACI 229 controlled density fill to fill and stabilize the void through a small 150 mm (6-inch) hydro-vacuumed hole in the pavement.This paper will focus on the technologies utilized to quantify the risk, the decision process to determine the best solution, and details on the design implementation of the emergency repair.
机译:在多伦多市中心的中心的一条非常繁忙的街道下,Wellesley Street Requare Repain完成了900毫米(36英寸)x 600 mm(24英寸)砖水道。该下水道被多伦多水的CIPP康复编制,但预介绍视频透露了砖下水道的广泛碎片和严重的不稳定性(管道的橡木表现出与逆转曲率变形)。当碎屑被小心地被拆除时,发现管道中的一个大孔,并且管道外部的甚至更大的空隙显示出来。与空隙相反的主动服务连接增加了空隙尺寸迅速增加的风险。测定空隙约为4米长,体积为6m 3(8YDS3)。为了进一步提高空隙传播到表面的风险的严重程度,在空隙顶部的1米范围内,12英寸铸铁水素在1米范围内。由于西瓜的存在,物流通过挖掘修复管道的挖掘将是破坏性的,复杂的,并且具有高风险。终极解决方案是一种非常创新的恒星修复,包括安装CIPP衬垫,以稳定管道,然后使用ACI 229受控密度填充以填充和稳定空隙,通过小的150 mm(6英寸)水电真空孔填充和稳定空隙路面。本文将重点关注用于量化风险的技术,确定最佳解决方案的决策过程,以及关于紧急修复的设计实施的细节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号