THE FINAL PIECE OF THE PUZZLE: RE-DESIGN OF GROUTED CLOSURES FOR A DAM CUTOFF WALL

机译:拼图的最后一块:重新设计水坝截止墙的灌浆封闭件

获取原文

摘要

Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable damsafety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall(SMCW) with occasional sections of steel sheet piling, was constructed along the dam alignment.Closures were required at the terminus of the soil mix elements with existing structures or coffer cells,and at locations where new sheet piling was constructed parallel to the new soil mixed cutoff wall,creating a short circuit seepage path. The original proposed design to construct these closures includedpermeation grouting methods with chemical grouts. However, a combination of multiple chemical grouttypes, multiple grout pipes, and an extensive post-grouting verification program was required to ensurethe design intent was achieved. After award of the project, the specialty grouting contractor elected toevaluate jet grouting as an alternative closure construction method. The advantages of the jet groutingoption offered potential schedule and cost savings to the project as well as a superior product for seepagereduction, given the mixed soil conditions at the site. This paper presents an examination of the siteconditions and project goals for the construction of the proposed closure elements for the rehabilitation ofBuckeye Lake Dam. Descriptions of the original and alternative treatment methods are provided, withexpected performance results. A description of the relative strengths and deficiencies of each method, aswell as the feasibility and constructability of each method is provided. The implementation of the jetgrouting program is presented, including a discussion of the design elements, quality control test methods,movement monitoring, and verification test methods. This paper also examines the risks associated withjet grouting and how those risks were mitigated during the grouting operations.
机译:由于不可接受的水坝,Buckeye Lake Dam基本上在2015年和2018年之间进行了修复安全性能。永久渗流截止,主要由土壤混合截止墙组成(SMCW)偶尔部分钢板堆积,沿坝对齐构建。在土壤混合物元素与现有结构或箱子细胞的末端需要闭合,在新纸张平行于新的土壤混合截止墙上构建的地方,创建短路渗漏路径。原始的建议设计包括构造这些封闭物用化学灌浆渗透灌浆方法。但是,多种化学灌浆的组合需要进行类型,多个灌浆管道和广泛的灌浆后验证程序以确保设计意图是实现的。在奖励项目后,特种灌浆承包商选举评估喷射灌浆作为替代闭合施工方法。喷射灌浆的优点选项为项目提供了潜在的计划和节省成本,以及渗漏的优越产品鉴于现场的混合土壤条件减少。本文提出了对该网站的检查建议拟议闭合要素的条件和项目目标进行康复Buckeye Lake Dam。提供了原始和替代处理方法的描述预期的绩效结果。每个方法的相对强度和缺陷的描述,如以及提供各种方法的可行性和结构。射流的实施提出了灌浆计划,包括讨论设计元素,质量控制测试方法,运动监控和验证测试方法。本文还研究了与之相关的风险喷射灌浆以及在灌浆操作期间如何减轻风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号