首页> 外文会议>Fuzzy Systems and Knowledge Discovery,(FSKD), 2008 Fifth International Conference on >An Interval-Parameter Multi-stage Stochastic Chance-Constrained Mixed Integer Programming Model for Inter-basin Water Resources Management Systems under Uncertainty
【24h】

An Interval-Parameter Multi-stage Stochastic Chance-Constrained Mixed Integer Programming Model for Inter-basin Water Resources Management Systems under Uncertainty

机译:不确定条件下跨流域水资源管理系统的区间参数多阶段随机机会约束混合整数规划模型

获取原文

摘要

In this study, an interval-parameter multi-stage stochastic chance-constrained mixed integer programming (IMSCMIP) method has been developed for inter-basin water resources management systems under uncertainty. By incorporating the chance-constrained programming (CCP) techniques, and mixed integer programming within an interval-parameter multi-stage stochastic programming framework, the model improves upon the interval-parameter multi-stage stochastic programming (IMSP) and can deal with uncertainties expressed as not only possibility and probabilities distributions but also as discrete intervals, and can incorporate pre-defined water policies directly into its optimization process. A multilayer scenario tree is used to tackle the uncertainties expressed as probability distributions and discrete intervals in IMSCMIP.
机译:在这项研究中,为不确定性下的跨流域水资源管理系统开发了一种区间参数多阶段随机机会约束混合整数规划(IMSCMIP)方法。通过将机会约束编程(CCP)技术和混合整数编程纳入间隔参数多阶段随机编程框架中,该模型对间隔参数多阶段随机编程(IMSP)进行了改进,并且可以处理表示的不确定性不仅是可能性和概率分布,而且是离散的间隔,并且可以将预定义的水政策直接纳入其优化过程。多层方案树用于解决在IMSCMIP中表示为概率分布和离散间隔的不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号