首页> 外文会议>Fusion Engineering 2005, Twenty-First IEEE/NPS Symposium on >Strategy of Structural Analysis of W7-X Magnet System
【24h】

Strategy of Structural Analysis of W7-X Magnet System

机译:W7-X磁铁系统的结构分析策略

获取原文

摘要

The Wendelstein 7-X (W7-X) stellarator project goal is to demonstrate that the stellarator is a viable option for a fusion power-plant. The W7-X is in advanced construction phase and has entered the assembly phase in Greifswald, Germany. The W7-X "pentagonal" basic magnet system is highly sensitive to the parameter variations; therefore the strategy of the structural analysis with the ultimate goal to create a tree of numerical models, which has to reliably predict stellarator structural behaviour, is in development and implementation phases. This paper gives an overview of the strategy and focuses on challenging boundary conditions and the most interesting results of the analyses
机译:Wendelstein 7-X(W7-X)恒星发生器项目的目标是证明该恒星发生器是核电站的可行选择。 W7-X处于先进的制造阶段,已进入德国格赖夫斯瓦尔德的装配阶段。 W7-X“五边形”基本磁体系统对参数变化高度敏感;因此,结构分析策略的最终目标是创建一个数值模型树,该模型必须可靠地预测恒星器的结构行为,目前处于开发和实施阶段。本文概述了该策略,重点介绍了具有挑战性的边界条件和最有趣的分析结果

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号