首页> 外文会议>International Conference on Software Testing, Verification and Validation Workshops >Estimating Costs for Adopting and Using Model-Based Testing in Agile SCRUM Teams
【24h】

Estimating Costs for Adopting and Using Model-Based Testing in Agile SCRUM Teams

机译:估算在敏捷Scrum团队中采用和基于模型的测试的成本

获取原文

摘要

The introduction of Model-Based testing (MBT) in software development teams introduces change in software testing, as traditional testing processes are replaced by MBT. When planning for MBT adoption, team leaders can benefit from tools that are able to provide information on the cost of introducing MBT in their teams. We have developed and present a set of models, which, given a number of initial parameters such as employee competence and availability, as well as historic usage of data, can estimate costs for MBT adoption. These models are designed based on experience from previous practicing of MBT. To demonstrate the practical value of our models, we run a number of simulations on hypothetical MBT adoption and use scenarios, which can be realistically applied to different teams considering adopting MBT.
机译:软件开发团队中基于模型的测试(MBT)引入了软件测试的变化,因为传统的测试过程由MBT取代。 在规划MBT采用时,团队领导者可以从能够提供有关其团队中介绍MBT成本的工具中的工具中受益。 我们已经开发并呈现了一系列型号,其中许多初始参数,例如员工能力和可用性,以及数据的历史使用,可以估算MBT采用的成本。 这些型号是根据PBT先前练习的经验设计的。 为了展示我们模型的实用价值,我们在假设的MBT采用和使用方案上运行了许多模拟,这可以在考虑采用MBT的不同团队上进行实际应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号