首页> 外文会议>ISES solar world congress;IEA SHC International conference on solar heating and cooling for buildings and industry >SWC_ A Study on the Economic Analysis of Zero Energy Building Using Solar Photovoltaic Energy in Korea
【24h】

SWC_ A Study on the Economic Analysis of Zero Energy Building Using Solar Photovoltaic Energy in Korea

机译:SWC_韩国太阳能光伏零能耗建筑经济分析研究

获取原文

摘要

In South Korea, Zero Energy Building (ZEB) certification is currently being enforced to reduce building energy and greenhouse gas (GHG) emissions. In order to obtain ZEB certification, it is necessary to secure a self-sufficiency rate through renewable energy production based on annual primary energy requirements. At present, in the case of electric power transactions of distributed power in South Korea, market transactions are avoided because the burden of transaction and administrative costs for market transactions compared to profits from electricity sales is high. Under such a situation, if the performance of a general building improves in accordance with the ZEB certification standards, various additional costs will inevitably arise. Therefore, it is necessary to examine the economic feasibility of ZEBs by certification grade. In order to secure economic feasibility, this study reviews the means to secure economic feasibility through payback period (PBP), net present value (NPV), and sensitivity analysis to secure economic feasibility considering the simple payback PBP analysis that ignores discount rate and variables (passive additional cost, surplus power selling unit price, and renewable energy subsidy ratio) based on costs arising from energy saving. Zero Energy Building (ZEB); Certification; Distributed esources; Renewable Energy; Solar Photovoltaic Energy; Passive.
机译:在韩国,零能耗建筑(ZEB)认证目前正在执行,以减少建筑能耗和温室气体(GHG)排放。为了获得ZEB认证,有必要通过基于年度一次能源需求的可再生能源生产来确保自给率。目前,在韩国的分布式电源的电力交易中,避免了市场交易,这是因为与电力销售利润相比,市场交易的交易负担和管理成本很高。在这种情况下,如果一般建筑物的性能按照ZEB认证标准进行改进,将不可避免地产生各种额外费用。因此,有必要按认证等级检查ZEB的经济可行性。为了确保经济可行性,本研究回顾了通过投资回收期(PBP),净现值(NPV)和敏感性分析来确保经济可行性的方法,其中考虑了忽略折现率和变量的简单投资回收期PBP分析(被动额外成本,剩余电力销售单价和可再生能源补贴率)。零能耗建筑(ZEB);认证;分布式资源;再生能源;太阳能光伏发电;被动的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号