首页> 外文会议>ASME-ARPEL International Pipeline Geotechnical Conference >UTILISATION OF SHEET PILES IN THE OCENSA'S RIGHT OF WAY FOR SLOPE STABILISATION AND BIOENGINEERING WORKS
【24h】

UTILISATION OF SHEET PILES IN THE OCENSA'S RIGHT OF WAY FOR SLOPE STABILISATION AND BIOENGINEERING WORKS

机译:利用美国国家统计局的路堤桩来进行边坡稳定和生物工程

获取原文

摘要

On the maintenance carried out by OCENSA for slope stabilization in areas with geotechnical issues, protection of lateral streams' banks, maintenance of the Right of Way (RoW) embankment or access roads, sheet piles have been successfully used. The paper describes the different alternatives and their uses. Among them are: terraces to facilitate drainage and plant recovery, PVC sheet piles for protection of stream banks, sheet piles made of carbon steel pipe and steel deck in which the piles can be driven by percussion or previously excavated with drilling machine.
机译:在由OCENSA进行的用于维护岩土工程领域的边坡的维护工作,对侧向河堤的保护,对路权(RoW)路堤或通道的维护,板桩已被成功使用。本文介绍了不同的替代方案及其用途。其中包括:便于排水和植物恢复的梯田,用于保护溪流的PVC板桩,由碳钢管制成的板桩以及可以通过敲击打桩或事先用钻孔机挖掘的钢甲板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号