Coordination of Electricity Protection in Piru Power Grid

机译:皮鲁电网的电力保护协调

获取原文

摘要

PT. Seram Energi Lestari, a developer company, is planned to interconnect Biomass Power Generation 2 x 3 MW with Piru 20 KV system PT. PLN Maluku and North Maluku Region. The purpose of this system development is expected to meet all load needs in Piru Island system. This interconnection system requires a study of electrical analysis both on Biomass Generation and the distribution network of PT. PLN itself. From the results of simulations and tests, correct setting and coordination values can be obtained, include characteristic curve of protection relay, where relay set is both overcurrent and ground fault relay. This study suggested longer gradation time for releasing CB to meet the needs of Piru to Kairatu load requirements. Result of research aims to improve reliability and continuity of new integrated power grid.
机译:PT。开发公司Seram Energi Lestari计划将2 x 3 MW生物质能发电与Piru 20 KV系统PT互连。 PLN马鲁古和北马鲁古地区。该系统开发的目的有望满足Piru Island系统中的所有负载需求。这种互连系统需要研究生物质发电和PT配电网络的电气分析。 PLN本身。从仿真和测试结果中,可以获得正确的设置和协调值,包括保护继电器的特性曲线,其中继电器组既是过电流继电器又是接地故障继电器。这项研究建议释放CB的分级时间更长,以满足Piru到Kairatu负载需求的需求。研究结果旨在提高新型集成电网的可靠性和连续性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号