首页> 外文会议>ASME Power Conference >CALPINE IMPROVES ACCURACY OF STEAM FLOW MEASUREMENT WITH TOP-MOUNTED ANNUBAR FLOWMETER
【24h】

CALPINE IMPROVES ACCURACY OF STEAM FLOW MEASUREMENT WITH TOP-MOUNTED ANNUBAR FLOWMETER

机译:Calpine提高了蒸汽流量测量的准确性,与顶部安装的Annubar流量计

获取原文

摘要

Getting steam out of the ground is the first crucial step in the conversion of geothermal steam into electricity. Getting it to the turbine and making the steam flow measurement is likewise important. It is at the turbine or, more precisely, just before the turbine, that many measurements are made. Performance Acceptance Tests (PAT's) are conducted here to ensure that the equipment provided by the turbine manufacturer is performing as specified. The need for accurate steam flow measurement is critical on the main steam line (MSL). Historically, orifice plates, venturies and averaging pitot tubes have been used with greater or lesser success and with associated challenges. Orifice plates typically have high permanent pressure losses and averaging pitot tubes have small holes on their leading edge which can plug. A different solution is needed - one that provides an accurate and repeatable measurement with low maintenance requirements. In recent testing spanning over a year of operation, it was found that an Annubar flowmeter, installed in the top mounted position, provided the low permanent pressure loss, and met the accuracy, repeatability and maintenance requirements of the end user. Typically, in steam applications with Annubar primary elements, conventional wisdom dictates that the Annubar primary element and transmitter be positioned below the pipe. The previously recommended orientation has a number of issues particularly with geothermal steam and its constituents (silica scale, non-condensable gases,) plus the likelihood that pockets of condensate will form and lead to metallurgical issues including stress corrosion cracking, thus shortening the life of the primary element. The installation can be further enhanced with an automated nitrogen purge system that blows nitrogen through the Annubar primary element to ensure the ports remain clear. The MSL flow measurement is critical for regulatory compliance and performance monitoring. Knowing with precision and repeatability the volumetric steam flow rate is critical. The top-mounted Annubar flowmeter with nitrogen purge system, which has been in service for more than a year, has proven to be reliable and has provided precise, repeatable measurement of steam flow.
机译:走出地面的蒸汽是将地热蒸汽转化为电力的第一个关键步骤。将其送到涡轮机并使蒸汽流量测量同样重要。它位于涡轮机上,或者在涡轮机之前更精确地进行许多测量。在此进行性能验收测试(Pat's),以确保由涡轮机制造商提供的设备如规定执行。对准确蒸汽流量测量的需求在主蒸汽线(MSL)上是至关重要的。历史上,孔板,工通风口和平均皮托管已被使用更大或更少的成功和相关的挑战。孔板通常具有高永久性压力损失,并且平均皮托管在其前缘上具有小孔,可以堵塞。需要不同的解决方案 - 提供具有低维护要求的准确和可重复测量的解决方案。在最近的测试中跨越一年的操作,发现安装在顶部安装位置的Annubar流量计,提供了低永久压力损失,并符合最终用户的准确性,可重复性和维护要求。通常,在具有Annubar主元件的蒸汽应用中,传统智慧要求Annubar主元件和发射器位于管道下方。先前推荐的方向具有许多问题,特别是具有地热蒸汽及其成分(二氧化硅级,不可缩合气体)加上凝结物的可能性的可能性,并导致冶金问题,包括压力腐蚀裂缝,从而缩短了寿命主要元素。通过自动氮气吹扫系统可以进一步增强安装,该系统通过Annubar主元件吹氮,以确保端口仍然清晰。 MSL流量测量对于法规遵从性和性能监测至关重要。用精度和重复性知道,体积蒸汽流量是至关重要的。具有氮气吹扫系统的顶盖Annubar流量计,已被持续超过一年,已被证明可靠,并提供了精确的,可重复测量蒸汽流量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号