首页> 外文会议>International Conference on Computation of Power, Energy, Information and Communication >Performance Analysis And Mitigation Of Power Quality Issues With Hybrid B – Statcom In 140 Bus Distribution System Connected To Scig Wind Turbine
【24h】

Performance Analysis And Mitigation Of Power Quality Issues With Hybrid B – Statcom In 140 Bus Distribution System Connected To Scig Wind Turbine

机译:与Scig风力涡轮机相连的140总线配电系统中的混合B – Statcom的性能分析和电能质量问题的缓解

获取原文

摘要

This paper gives the Performance Analysis and Mitigation of Power Quality Issues with Hybrid B–STATCOM in 140 Bus Distribution System Connected To SCIG Wind Turbine. It is an important task to maintain the power quality within the system operating limits and facilities in a distributed power grid. In the developed 140 bus system a hybrid battery energy storage system and STATCOM (BSTATCOM) with hysteresis current control strategy is proposed for an inverter to improve power quality with an exchange of current and voltage simultaneously. The operation mode switches a flawless transfer of the operation mode from grid-connected to stand-alone or vice versa. The outside of an islanded bus voltage loop and inside B – STATCOM inverter current loop, controllers are designed using h current control strategy with three phase and four wire system. The injected currents are clean, balanced and free from harmonics. The islanded bus relives from the main power supply and the demand of reactive power supplied from the squirrel cage induction generator and B – STATCOM follows the rules of grid operation as per IEC 61400 – 21. The control scheme of 140 bus distribution power grid connected SCIG wind energy system verified using simulation MATLAB/ SIMULINK power system block sets.
机译:本文给出了在与SCIG风力发电机相连的140总线配电系统中使用混合B–STATCOM进行性能分析和解决电能质量问题的方法。将电源质量保持在分布式电网中的系统运行限制和设施范围内是一项重要的任务。在已开发的140总线系统中,提出了一种具有滞后电流控制策略的混合电池储能系统和STATCOM(BSTATCOM),用于逆变器以同时交换电流和电压来改善电能质量。操作模式将操作模式从无电网切换到独立运行,反之亦然。在孤岛式总线电压环路的外部和B – STATCOM逆变器电流环路的内部,使用具有四相和三相系统的h电流控制策略来设计控制器。注入的电流干净,平衡且无谐波。孤岛的总线从主电源恢复,而鼠笼式感应发电机和B – STATCOM的无功功率需求遵循IEC 61400 – 21的电网运行规则。140条总线分配的电网连接SCIG的控制方案使用仿真MATLAB / SIMULINK电力系统模块组验证了风能系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号