Independent Energy Storage Systems can Minimize Uncertainty of Profit for Retailers in ISO Market

机译:独立的储能系统可以最大程度地减少零售商在ISO市场中的利润不确定性

获取原文

摘要

Day by day many countries in the world have been introducing the deregulated power market. The independent system operator (ISO) runs and manage the whole system of deregulated market. ISO also runs the wholesale market, retailers and generations companies enter the wholesale market for biding and ISO clears the market. As it is a competitive market, so retailer should make optimal bidding that means they should not buy electricity more or less than their demand. In deregulated market normally retailer can bid in three different times, day ahead bidding, hour ahead bidding and spot market bidding. The day ahead market price of electricity is cheaper than hour ahead and spot market. However, retailers of the deregulated power market have to deliver their power to the transmission line at the right time according to their contract. As we know, demand for electricity has uncertainty, it is varying from time to time. If a retailer is unable to deliver a certain amount of electricity on a specific time, ISO has ancillary transmission right to set a large penalty for retailers. This research introduces an independent energy storage system (IESS) who is reducing the problem of hour ahead market's retailer transmission penalty by meeting load mismatch. Besides this research reduces the installation cost of IESS. The effectiveness and simulation results are examined by MATLAB® simulation.
机译:每天,世界上许多国家/地区都在引入放松管制的电力市场。独立系统运营商(ISO)运行和管理放松管制的市场的整个系统。 ISO还经营批发市场,零售商和世代公司进入批发市场进行招标,ISO清理了市场。由于这是一个竞争激烈的市场,因此零售商应进行最佳出价,这意味着他们不应购买多于或少于需求的电力。在放松管制的市场中,零售商通常可以在三个不同的时间进行竞标,即提前竞标,提前小时竞标和现货市场竞标。提前一天的电价比提前一个小时的电价便宜。但是,电力市场放松管制的零售商必须根据合同在适当的时间将其电力输送到输电线路。众所周知,电力需求具有不确定性,并且时有变化。如果零售商无法在特定时间交付一定量的电量,则ISO拥有辅助传输权,可对零售商处以高额罚款。这项研究引入了一个独立的储能系统(IESS),该系统通过满足负载不匹配的问题,减少了提前一个小时的市场对零售商的传输损失的问题。除此之外,这项研究还降低了IESS的安装成本。有效性和仿真结果通过MATLAB进行了检验 ® 模拟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号