On the premise of developing sources of renewable energy, with a focus on the wind power plants in Dobrogea area, the current paper outlines a projected scenario of an electric power increase in the aforementioned area in line with grid connection contracts and the impact of a potential power growth might bear on the electric grid of transportation. Hereby shall be analysed the utility of having installed flexible alternating current transmission system - FACTS inside the National Power System so as to adjust the voltages in the grid's nodes susceptible to problems. The equipment to be utilised is the static synchronous compensator - STATCOM. The analysis is conducted on the perspective grid for 2022, within which 400 kV OHL Cernavod? - Stalpu is assumed, for which financing from the European Commission has been secured.
机译:在开发可再生能源来源的前提下,专注于多溴地区的风电厂,目前的论文概述了上述区域的电力增加的预计场景,符合网格连接合同和潜力的影响功率增长可能涉及交通电网。因此,应分析在国家电力系统内安装灵活的交流传输系统的效用,以便调整易受问题的网格节点中的电压。要使用的设备是静态同步补偿器 - Statcom。分析在2022的透视电网上进行,在其中400 kV OHL Cernavod? - Stalpu被认为,欧洲委员会的融资已得到保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号