首页> 外文会议>International Workshop on Complexity and Approximation >Active and Busy Time Scheduling Problem: A Survey
【24h】

Active and Busy Time Scheduling Problem: A Survey

机译:繁忙时间计划问题:一项调查

获取原文

摘要

We present an overview of recent research on the busy time and active time scheduling model, which has its applications in energy efficient scheduling for cloud computing systems, optical network design and computer memories. The major feature of this type of scheduling problems is to aggregate job execution into as few time slots as possible to save energy. The difference between busy time and active time is that the former refers to multiple machines while the latter refers to a single machine. After summarizing the previous results on this topic, we propose a few potential future directions for each model.
机译:我们提供了繁忙时间和活动时间调度模型的最新研究概述,该模型在云计算系统,光网络设计和计算机内存的节能调度中具有应用。这种调度问题的主要特征是将作业执行汇总到尽可能少的时隙中,以节省能源。繁忙时间与活动时间之间的区别在于,前者指的是多台计算机,而后者指的是单台计算机。在总结了有关该主题的先前结果之后,我们为每种模型提出了一些潜在的未来方向。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号