Lake Ogletree serves as the primary drinking water supply for the City of Auburn, Alabama. The dam and spillway were originally constructed in the 1940's and both have undergone several modifications over the years. Due to undermining of the existing overflow spillway, rehabilitation of the spillway system was considered necessary by the Water Works Board of the City of Auburn (AWWB) in order to reduce the risks associated with the aging system and protect the city's water resource interests. Alabama is the only state without a dam safety program. This provided the project with both challenges and opportunities. Most significantly, the designers had the opportunity to assist the AWWB with selecting a reasonable and justifiable design storm for the proposed spillway. The project included replacement of the existing 525-foot wide, thin slab, concrete broad-crested spillway with a 218-foot wide, 5.5 cycle labyrinth-crested chute spillway. The labyrinth spillway included four crest stages to match existing spillway outflows associated with storms up to the 100-year event. Three-dimensional computational fluid dynamics (CFD) analyses were performed to assess flow velocities within the proposed inlet channel. This modeling indicated a need for an armor-reinforced vegetation system in the inlet channel. During construction, large subsurface voids were encountered during excavation for the proposed spillway. This impacted the construction schedule and resulted in the need for coordination between the client, the contractor, and designer to plan and implement remediation strategies. Additional subsurface explorations of the site were performed to estimate the extent of the encountered voids. This exploration included the use of geophysical techniques, sonic drilling, and air track drilling. The rehabilitation work was completed in late 2017. The AWWB was selected to receive the 2018 ASDSO Southeast Regional Award of Merit for their efforts related to this project.
机译:Ogletree湖是阿拉巴马州奥本市的主要饮用水供应。大坝和溢洪道最初建于1940年代,多年来经过多次修改。由于现有溢流溢洪道的破坏,奥本市水务委员会(AWWB)认为有必要对溢洪道系统进行修复,以减少与老化系统相关的风险并保护该市的水资源利益。阿拉巴马州是唯一没有大坝安全计划的州。这给项目带来了挑战和机遇。最重要的是,设计师有机会协助AWWB为拟议的溢洪道选择合理和合理的设计风暴。该项目包括用218英尺,5.5周期的迷宫式斜槽溜槽溢洪道替换现有的525英尺宽,薄板,混凝土宽顶溢洪道。迷宫式溢洪道包括四个波峰阶段,以匹配到100年事件之前与风暴相关的现有溢洪道流出量。进行了三维计算流体动力学(CFD)分析,以评估拟议进口通道内的流速。该模型表明在入口通道中需要铠装增强的植被系统。在施工过程中,拟建溢洪道的开挖过程中遇到了较大的地下空隙。这影响了施工进度,并导致需要在客户,承包商和设计师之间进行协调以计划和实施补救策略。对该场地进行了另外的地下勘探,以估计遇到的空洞的程度。这项探索包括使用地球物理技术,声波钻探和气道钻探。修复工作已于2017年底完成。AWWB因其在该项目上的努力而被选为2018 ASDSO东南地区优异奖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号