首页> 外文会议>International conference on construction and real estate management >Study on the Performance Influencing Factors of Expressway Project Based on PPP Mode
【24h】

Study on the Performance Influencing Factors of Expressway Project Based on PPP Mode

机译:基于PPP模式的高速公路项目绩效影响因素研究

获取原文

摘要

Considering the characteristics of expressway project based on PPP mode in China, 18 typical factors affecting the expressway PPP project implementation performance are identified from the aspects of economy, production, operation, participants, and sustainability. Then we use the triangular fuzzy AHP (TFAHP) to determine the impact degree of each factor on project implementation effect. According to the result of factors' weights, this paper analyzed how these various factors' affect project performance. The research shows that among all these influencing factors, the road condition in operation, the revenue from road toll, and the return on investment are main factors that affecting the expressway implementation performance. We put forward that the project operational effectiveness and project economy should be paid more attention in the process of performance monitoring and tracking. Through these measures, the performance level of expressway project based on PPP mode can be improved, and the PPP model can be better applied to the construction of infrastructure.
机译:结合我国基于PPP模式的高速公路项目特点,从经济,生产,经营,参与方,可持续性等方面,确定了影响高速公路PPP项目实施绩效的18个典型因素。然后使用三角模糊层次分析法(TFAHP)确定各因素对项目实施效果的影响程度。根据因素权重的结果,分析了这些因素如何影响项目绩效。研究表明,在所有这些影响因素中,运营道路状况,公路通行费收入以及投资回报是影响高速公路实施绩效的主要因素。我们提出,在绩效监控和跟踪过程中,应更加重视项目的运营有效性和项目经济性。通过这些措施,可以提高基于PPP模式的高速公路项目的绩效水平,并且可以更好地将PPP模型应用于基础设施建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号