首页> 外文会议>Collection systems conference >We Do This for the Kids and Fishes: Implementing Comprehensive Public and Private Rehabilitation to Eliminate SSOs near Schools
【24h】

We Do This for the Kids and Fishes: Implementing Comprehensive Public and Private Rehabilitation to Eliminate SSOs near Schools

机译:我们为孩子和鱼做这件事:实施全面的公共和私人康复,以消除学校附近的SSO

获取原文

摘要

The City of Portland Oregon Bureau of Environmental Services (BES) initiated a Rain-Derived Inflow and Infiltration (RDII) Program as an element of an overall System Plan. The System Plan recommended conveyance improvements and prioritized RDII reduction projects to address capacity deficiencies, provide for community growth, and the rehabilitation of an aging collection system. Repeated sanitary sewer overflows (SSOs) from a manhole located near a middle school and upstream of a small creek resulted in a mandate and schedule from the state to eliminate the SSOs at this location. High inflow and infiltration (I/I) rates into a sanitary sewer system that serves this hillside residential area of Portland caused the repeated sewer overflows. To address this, the City embarked on a comprehensive, multiple year program to identify sources of I/I, reduce sources through pipe rehabilitation projects, and then quantify the effectiveness of the rehabilitation efforts at lowering I/I rates. The City conducted source detection and flow monitoring to establish baseline conditions. Hydraulic and hydrologic models of the system were created and calibrated to the flow monitoring data. The models were used to evaluate RDII reduction and conveyance alternatives. RDII reduction projects in three sub-basins were selected for 'early action'. These projects included rehabilitation of mainlines, public laterals and private laterals. Post-project flow monitoring and modeling were conducted to evaluate the effectiveness of the projects. The program had set 40% and 60% reduction goals and has achieved 56% and 73% reduction effectiveness. This paper will set out the program, the hydraulic analysis, the Capital Improvement Program (CIP) implementation, the measurable RDII reduction, and the ongoing verification of these results.
机译:俄勒冈州波特兰市环境局(BES)发起了一项雨水流入与入渗(RDII)计划,作为总体系统计划的一部分。系统计划建议改善运输方式,并优先减少RDII,以解决能力不足,促进社区发展和恢复老化收集系统的问题。一所中学附近和一条小河上游的一处人孔反复出现下水道卫生溢流(SSO),导致该州政府下达了强制性命令和时间表,以消除该地点的SSO。较高的流入和渗透(I / I)率进入服务于波特兰这个山坡居民区的下水道卫生系统,导致下水道屡次溢出。为解决此问题,纽约市启动了一项全面的多年计划,以识别I / I的来源,通过管道修复项目减少来源,然后量化降低I / I率的修复工作的有效性。纽约市进行了源头检测和流量监测,以建立基准条件。创建了系统的水力和水文模型,并根据流量监控数据进行了校准。该模型用于评估RDII减少和运输的替代方案。选择了三个子流域的RDII减少项目进行“早期行动”。这些项目包括干线,公共分支和私有分支的修复。进行了项目后流程监控和建模,以评估项目的有效性。该计划设定了40%和60%的减排目标,并实现了56%和73%的减排效果。本文将列出程序,水力分析,资本改进计划(CIP)的实施,可测量的RDII减少以及对这些结果的持续验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号