Challenges with Designing a Potable Water Transmission Pipeline across the Navajo Reservation

机译:设计横跨那瓦伙族人保留地的饮用水输送管道的挑战

获取原文

摘要

The Navajo-Gallup Water Supply Project (NGWSP) is a major infrastructure endeavor that will convey a reliable municipal and industrial water supply for future generations on Navajo Nation land and the Four Corners Region. The project will service northwest New Mexico, including the eastern section of the Navajo Nation, the southwestern portion of the Jicarilla Apache Nation (JAN), and the city of Gallup (COG) via approximately 300 miles of pipeline, 19 pumping plants, and 2 water treatment plants. The pipeline will cross various land ownership types (tribal, state, private, and federal) with different regulatory agencies, and unclear jurisdictional boundaries presenting many obstacles for alignment consideration. Additionally, highly corrosive soils and wash crossings influence the pipe material selection while preserving environmental and cultural resources. Public outreach is vital toward earning the public's buy-in through education of the residents, informing them of the project's progress. The NGWSP has a congressionally-mandated deadline for completion by December 31, 2024.
机译:纳瓦霍人盖洛普供水项目(NGWSP)是一项重大的基础设施工作,它将为纳瓦霍人的土地和四个角落地区的子孙后代提供可靠的市政和工业用水。该项目将通过约300英里的管道,19个抽水厂和2个服务于新墨西哥州西北部,包括纳瓦霍民族的东部,吉卡利拉阿帕奇民族(JAN)的西南部分和盖洛普(COG)市。水处理厂。该管道将​​与不同的监管机构跨越各种土地所有权类型(部落,州,私人和联邦),并且不明确的司法管辖区边界为协调考虑提供了许多障碍。此外,高腐蚀性土壤和冲洗通道会影响管道材料的选择,同时保留环境和文化资源。公众宣传对于通过对居民进行教育并向他们告知项目进展情况来赢得公众的认可至关重要。 NGWSP的国会授权截止日期为2024年12月31日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号