首页> 外文会议>ASME Pressure Vessels Piping Conference >FURTHER IMPROVEMENTS TO ASME SECTION XI CODE CASE N-806 IN A PROPOSED SECOND REVISION
【24h】

FURTHER IMPROVEMENTS TO ASME SECTION XI CODE CASE N-806 IN A PROPOSED SECOND REVISION

机译:拟议第二修订版中对ASME XI密码案例N-806的进一步改进

获取原文

摘要

ASME Section XI Code Case N-806, for evaluation of metal loss in Class 2 and 3 metallic piping buried in a backfilled trench, was first published in 2012. This Code Case has been prepared by the ASME Section XI Task Group on Evaluation Procedures for Degraded Buried Pipe. The Code Case addresses the nuclear industry need for evaluation procedures and acceptance criteria for the disposition of metal loss that is discovered during the inspection of metallic piping buried in a back-filled trench. In a second revision of the Code Case, several changes are proposed. First, guidance is provided for analytical evaluation of greater detail including finite element analysis methods. A new nonmandatory appendix is included to provide procedures for the evaluation of soil and surcharge loads using finite element analysis. Next, a second new nonmandatory appendix is provided giving detailed guidance on the evaluation of seismic loads. Finally, the need to evaluate the fatigue life of buried piping subjected to cyclic surface loading is now included and a design factor applied to the modulus of soil reaction is introduced. This paper presents details of the proposed changes to Code Case N-806-1 and their technical basis where applicable.
机译:ASME第XI节规范案例N-806,用于评估埋在回填沟槽中的2级和3级金属管道中的金属损失,于2012年首次发布。该规范案例由ASME第XI节任务评估程序小组编写。退化的地下管道。该规范案例满足了核工业对评估在回填沟槽中埋藏的金属管道的过程中发现的金属损失的评估程序和验收标准的需求。在代码案例的第二次修订中,提出了一些更改。首先,为包括有限元分析方法在内的更详细的分析评估提供了指导。包括一个新的非强制性附录,以提供使用有限元分析评估土壤和超载荷载的程序。接下来,提供了第二个新的非强制性附录,为评估地震荷载提供了详细的指导。最后,现在需要评估承受循环表面载荷的地下管道的疲劳寿命,并引入适用于土壤反应模量的设计因子。本文介绍了对代码案例N-806-1的拟议更改及其适用的技术基础的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号