Premature Failure of Large Horse Power Motors due to Improper Field Connections, Installation and Commissioning: Copyright Material IEEE, Paper No. PCIC-2018-12

机译:由于现场连接不当,安装和调试,大型马电机的过早失效:版权所有IEEE,纸质号PCIC-2018-12

获取原文

摘要

The commissioning phase is the final stage of a project, before production. This is the phase of the project where all the pieces of the puzzle have to come together. The objective of commissioning is to demonstrate to the end user that the goals and objectives specified in the project scope have met the requirements. This paper will focus on premature failures of large motors in the oil and gas industries, which had improper field installation, connections and commissioning. Large horsepower (HP) motors are a key part of most projects and require a great deal of attention to details. Motors require relay protection, writing specifications, vetting suppliers, and testing protocols. The goal is to get desired life expectancy with trouble free service from the motor and the driven equipment. It is clear that good installation is a key to success. Incorrect installation of field connections and field modifications can shorten the life of the motor and instrumentation, and in some cases can lead to premature failures. This applies to a new installation as well as retrofits with an adjustable speed drive (ASD). This paper discusses multiple premature motor failures resulting from improper installations and offers possible protocols that may have prevented equipment failure and the downtime.
机译:调试阶段是在生产之前项目的最后阶段。这是项目的阶段,所有拼图都必须聚集在一起。调试的目标是向最终用户展示项目范围中规定的目标和目标已达到要求。本文将专注于石油和天然气行业的大型电动机的过早故障,具有不当的现场安装,连接和调试。大型马力(HP)电机是大多数项目的关键部分,需要对细节进行大量关注。电机需要继电器保护,写作规格,审查供应商和测试协议。目标是获得预期的预期寿命,从电机和驱动设备上免费提供免费服务。很明显,良好的安装是成功的关键。安装现场连接的不正确和现场修改可以缩短电机和仪器的寿命,在某些情况下可能导致过早失效。这适用于新安装以及可调速度驱动器(ASD)的改造。本文讨论了由安装不当导致的多次过早电机故障,并提供可能阻止设备故障和停机的可能协议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号