首页> 外文会议>AREMA annual conference >Operation under a Fouled Ballast Waiver
【24h】

Operation under a Fouled Ballast Waiver

机译:豁免的压载物操作

获取原文

摘要

Certain aspects of the current ballast regulations are qualitative and at times difficult to enforce. For example, when ballast is fouled and drainage is impaired, it can be difficult to assess when safety is compromised. To improve the understanding of the behavior ballast with fouling, FRA granted AAR a waiver from its current regulations ("Waiver") to allow the deterioration of track geometry at fouled ballast locations to be studied. The Waiver imposed conditions to study the behavior of track with fouled ballast and monitor operational safety. This paper describes the process adopted to comply with the Waiver conditions. The process involves keeping a master list of fouled ballast locations on routes chosen by BNSF. Weekly track geometry measurements are made. BNSF and FRA track inspectors use the data to decide when action is needed at each location. Operations under the Waiver are expected to continue until January 2019.
机译:当前的镇流器法规的某些方面是定性的,有时难以执行。例如,当压载物结垢且排水受到损害时,很难评估何时会损害安全性。为了增进对带有结垢行为的道behavior的理解,FRA豁免了AAR现行法规(“豁免”),以便研究结垢道locations位置处轨道几何形状的恶化。豁免规定了研究带有压载物的轨道行为并监控操作安全性的条件。本文介绍了遵守豁免条件所采用的过程。该过程涉及在BNSF选择的路线上保留污染的压载物位置的主清单。每周进行一次轨道几何尺寸测量。 BNSF和FRA跟踪检查员使用这些数据来决定何时需要在每个位置采取行动。豁免的运作预计将持续到2019年1月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号