首页> 外文会议>Geothermal Resources Council annual meeting >Theistareykir Geothermal Power Plant, A Sustainable Construction
【24h】

Theistareykir Geothermal Power Plant, A Sustainable Construction

机译:Theistareykir地热发电厂,可持续发展

获取原文

摘要

The geothermal area at Theistareykir in north east of Iceland has great potential for geothermal utilization, with an estimated capacity of up to 200 MW_e. In November 2017 commercial operation of the first phase of the Theistareykir power plant started. Today the Theistareykir geothermal power plant operates at 90 MW_e. Preparation work and research on the sustainable utilization of geothermal energy at Theistareykir began in 1999 by an association founded by local municipalities and regional utility companies, later merged into the National Power Company of Iceland, Landsvirkjun. The objective was to harness the geothermal resource in a sustainable way. In addition to planning, licensing and environmental impact assessment, the first 15 years were used for explorational drilling to confirm potential steam availability, stakeholder management with consultation to land owners and users of the planned construction area as well as a definition of vegetation reclamation program. At project launching in April 2015 nine steam wells with total of 58 MW_e capacity had been drilled. Landsvirkjun in co-operation with stakeholders launched the Northern Sustainability Project with the objective to capture expectations and concerns of planned construction and operation of the power plant. The project develops and monitors social-, environmental- and economical indicators for the power plant. Theistareykir Geothermal Power Project was chosen as a Pilot Project for testing of a new Geothermal Sustainability Assessment Protocol, GSAP. The result was that the project has been carried out in harmony with the environment and in consensus with the society. Safety and environmental matters were at the forefront during the project execution. This paper summarizes in brief the history of the Theistareykir geothermal power plant project along with the challenges and solutions the project team went through during the planning, design and construction of power plant.
机译:冰岛东北部Theistareykir的地热区具有巨大的地热利用潜力,估计容量可达200​​ MW_e。 2017年11月,Theistareykir电厂一期工程开始商业运营。今天,Theistareykir地热发电厂的运行功率为90 MW_e。 Theistareykir的地热能可持续利用的准备工作和研究始于1999年,该协会由当地市政当局和地区公用事业公司成立,后来合并为冰岛国家电力公司Landsvirkjun。目的是以可持续的方式利用地热资源。除了规划,许可和环境影响评估外,最初的15年还用于勘探钻探,以确认潜在的蒸汽供应量,与利益相关者的管理,与土地所有者和计划建筑区域的使用者的协商以及植被复垦计划的定义。在2015年4月启动的项目中,钻了9口蒸汽井,总产能为58 MW_e。 Landsvirkjun与利益相关者合作启动了“北部可持续发展项目”,目的是捕获对电厂计划建设和运营的期望和关注。该项目为发电厂开发和监控社会,环境和经济指标。 Theistareykir地热发电项目被选为试验性项目,用于测试新的地热可持续性评估协议GSAP。结果是该项目与环境和谐并与社会达成共识。在项目执行过程中,安全和环境事务处于最重要的位置。本文简要总结了Theistareykir地热电厂项目的历史,以及项目团队在电厂规划,设计和建设过程中所经历的挑战和解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号