首页> 外文会议>North American tunneling conference >Monitoring measures for underground rehabilitation of Line 4 Bucharest, Romania
【24h】

Monitoring measures for underground rehabilitation of Line 4 Bucharest, Romania

机译:罗马尼亚布加勒斯特第4行地下康复监测措施

获取原文

摘要

Bucharest Metro Line 4 has 4.7 km in length and it is an extension of Line 1, from Nicolae Grigorescu Station to Linia de Centura Station. This line includes two other stations (1 Decembrie 1918 and Policolor). The design for implementing Line 4 started in 1988 that including site investigations, hydro-geological studies and urban constraints (public utilities, buildings) surveys. The construction works began in 1989, as well as the monitoring program, which included surface marks, settlement pins in buildings, tunnel convergence pins and piezometers. The construction works for Line 4 were stopped in 1996, leading to flooding of tunnels and stations. Now, for the completion of works and the rehabilitation of Line 4 structures it is necessary to evaluate the geotechnical and tunnelling conditions, to safeguard the existing infrastructure.
机译:布加勒斯特地铁4号线4.7公里的长度为4.7公里,距离Nicolae Grigorescu Station-1号线到Linia de Centura Station。这条线包括另外两个站(1个Decembrie 1918和Policolor)。实施第4行的设计于1988年开始,包括现场调查,水力地质研究和城市限制(公用事业,建筑物)调查。建筑工程于1989年开始,以及监测计划,包括曲面标记,建筑物中的沉降销,隧道收敛销和压力计。 1996年,第4行的建筑工程停止,导致隧道和站的洪水。现在,为了完成工程和第4行结构的康复,有必要评估岩土和隧道条件,以保护现有的基础设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号