首页> 外文会议>North American tunneling conference >Design and Construction Considerations for Atwater Water Intake and Conveyance Tunnel in Montreal
【24h】

Design and Construction Considerations for Atwater Water Intake and Conveyance Tunnel in Montreal

机译:蒙特利尔地下水取水输送隧道的设计与施工考虑

获取原文

摘要

The City of Montreal plans to secure the existing water intake of the Atwater Treatment Plant by permanently isolating the section of the channel adjacent to nearby highway that is at risk from contamination and spills and constructing a new intake upstream. The new intake will be linked to the existing intake by a 877 m (0.5 mile) long 6 m (20 ft) diameter 30 m (100 ft) deep tunnel, two 6 m (20 ft) diameter vertical shafts, and an cut and cover connecting structure to the existing valve chamber. The geology consists of shale that is known to be fissile and slaking and is being excavated by drill-and-blast. The paper provides design considerations of this siphon tunnel as well as construction updates.
机译:蒙特利尔市计划通过永久隔离附近受污染和溢出危险的邻近高速公路的河道部分,并在上游新建一个取水口,来确保Atwater处理厂的现有取水量。新的进气口将通过长877 m(0.5英里)长6 m(20 ft),直径30 m(100 ft)的深水隧道,两个直径6 m(20 ft)的竖井和一个挖槽与现有的进气口相连。盖到现有阀室的连接结构。地质学由已知为易裂变和易碎裂的页岩组成,并通过钻爆进行挖掘。本文提供了该虹吸隧道的设计注意事项以及施工更新。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号