首页> 外文会议>Pipelines conference >Developing a New Pressure Plane at Super Speeds: Fort Worth Northside Ⅳ 24' Water Main
【24h】

Developing a New Pressure Plane at Super Speeds: Fort Worth Northside Ⅳ 24' Water Main

机译:以超高速开发新的压力机:沃思堡北侧Ⅳ24'水主管

获取原文

摘要

Fort Worth, one of the fastest growing cities in Texas, has recently taken aggressive steps to expand its water system to support the development. The city's north side is its fastest growing region. But due to the extreme growth, residents in the north side have seen multiple issues with their water supply, including excessive fluctuations in pressure and water quality issues. One part of the solution includes the development of a new pressure plane. New developments have prompted the city of Fort Worth to design, build, and put into service a new pressure plane and small-scale distribution system. The new pressure plane, Northside Ⅳ, needs to be in service within 18 months to serve proposed development. This paper describes the strategies used to plan and design a new pressure plane, including approximately 10,000 linear feet (3 km) of 24-inch (610 mm) diameter water transmission main, a pressure plane flow transfer station, and a hydropneumatic tank in four months while meeting regulatory requirements.
机译:德克萨斯州增长最快的城市之一的堡垒最近采取了积极的措施来扩大其水系统以支持发展。该市的北侧是其增长最快的地区。但由于极端的增长,北侧的居民已经看到了他们的供水的多个问题,包括压力和水质问题的过度波动。溶液的一部分包括开发新的压力平面。新的发展促使堡垒城市设计,建造,并投入使用新的压力平面和小规模分配系统。新的压力平面,北坡ⅳ,需要在18个月内在服务中进行拟议的发展。本文介绍了用于规划和设计新压力平面的策略,包括大约10,000线性脚(3km)的24英寸(610毫米)直径的水传输主,压力平面流动站和四个液体油箱满足监管要求的几个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号